Reports on Compliance and Enforcement

Below are searchable tables of reports on the work we do to check that companies are meeting requirements and the work we are doing to enforce those requirements. We take great care in making sure we enforce requirements in a manner that is fair predictable, consistent, timely, and transparent. Learn more about compliance and enforcement at the CER, our Enforcement Policy, and the tools available to enforce requirements.



Compliance verification activity reports

We go out in the field regularly to follow up with companies and to check that our regulations are being met. These regulations are there to protect people, property, and the environment. These reports are produced from field inspections and emergency response exercises that we do with companies. We’ll list whether we’ve issued a corrected non-compliance or a notice of non-compliance to a company in these reports.

  • Corrected non-compliance (CNC): This is issued for a noncompliance corrected during an inspection activity. The non-compliance must be addressed to the satisfaction of the inspection officer before the officer completes the site inspection (before the close out meeting.
  • Notice of non-compliance (NNC): If a company needs more time to address a noncompliance, the inspection officer issues what we call a notice of non-compliance.
Warning letters

We use warning letters in two ways: to let others know that a non-compliance still hasn’t been addressed and as a reminder about what may happen if the non-compliance happens again.

  • A reminder: Sometimes we may need to let others know that a non-compliance is not being addressed. This helps us generate the action necessary to help a company return to compliance. Warning letters can be sent to senior company officials or third parties.
  • A warning: We may also want to remind a company about how serious a non-compliance is, or was if they’ve already addressed it. The letter will warn of other enforcement action we may take if it happens again.

Search the table

Warning Letters
Recipient Description Documents
(yyyy-mm-dd)
Trans Mountain Pipeline ULC Non-compliance with s.47.2 of the Canadian Energy Regulator Onshore Pipeline Regulations 2020-09-10
Warning Letter
Individual

Non-compliance with the Canada Energy Regulator Pipeline Damage Prevention Regulations – Authorizations

2020-08-27
Warning Letter

Portal Municipal Gas Company of Canada Non-compliance with ss. 6.6 of the Onshore Pipeline Regulations 2019-09-26
Warning Letter
Canada Border Services Agency Non-compliance with ss. 6.2 and 6.6 of the Onshore Pipeline Regulations 2019-09-26
Warning Letter
Canadian Natural Resources Limited Non-compliance with ss. 6.6(1) of the Onshore Pipeline Regulations 2019-03-22
Warning Letter
AltaGas Limited Non-compliance with ss. 6.6(1) of the Onshore Pipeline Regulations 2019-01-22
Warning Letter
Preet Excavating Ltd. Non-compliance with the Pipeline Crossing Regulations, Part I and Damage Prevention Regulations – Authorizations 2018-10-16
Warning Letter
Surerus Murphy Joint Venture

Non-compliance with the NEB Act and Damage Prevention Regulations – Authorizations

2018-10-16
Warning Letter
City of Medicine Hat Non-compliances with ss. 112(1) of the NEB Act, with the Pipeline Crossing Regulations, Part  I and Damage Prevention Regulations – Authorizations 2018-04-18
Warning Letter
Potton Township Non-compliance with ss. 112(1) of the NEB Act and ss. 6(b) of the Pipeline Crossing Regulations, Part I 2017-01-27
Warning Letter
Individual Non-compliance with ss. 112(1)(2) of the NEB Act and ss. 6(b) of the Pipeline Crossing Regulations, Part I 2017-01-27
Warning Letter
Forty Mile Gas Coop Ltd. Failure to comply with conditions of Abandonment Order ZO-F073-003-2013 2015-09-08
Warning Letter
Canada Border Services Agency Non-compliance to ss. 6.2 and 6.6 of the Onshore Pipeline Regulations for 2013 and 2014 2015-09-02
Warning Letter
Administrative monetary penalties

Both companies and individuals can get fined for actions that are unsafe. It’s important that we take action to prevent harm and help stop something that could be dangerous from happening again.

We may fine a company or individual if:

  • serious harm has been caused or is likely to happen
  • the nature and severity of the non-compliance is significant
  • we need to escalate to a higher level of enforcement
  • we need to change behavior to prevent an issue from happening again

Maximum daily penalty per violation: We have a limit on how much a penalty for each violation can be each day. For individuals: $25,000.00. For companies: $100,000.00.

When a violation continues: A violation is considered a separate violation for each day that it continues. This means we issue separate penalties per violation, per day with no maximum total financial penalty.

No total limit: There is no total limit to how much an individual or company can be fined for a single violation. Only a daily maximum for each violation.

Find out more on how we calculate administrative penalties and about our process in the Administrative Monetary Penalties Process Guide, the Administrative Monetary Penalties Regulations (National Energy Board), and the Canada Oil and Gas Operations Administrative Monetary Penalties Regulations.

Search the table

For companies, you’ll see the name of the company, the date we issued the penalty, where and for what facility, the violation, and how much. We protect privacy and do not release the names of individuals.


Administrative Penalties
Reference
Number
Related
Documents
Last Updated
(yyyy-mm-dd)
Recipient Region/
Facility
Description Penalty
Amount
AMP-002-2020   2020-09-17 Westcoast Energy Inc. near Prince George, BC Violation of ss. 4(2) of the Onshore Pipeline Regulations – failure to ensure that the pipeline is operated in accordance with the programs, manuals, procedures, measures and plans developed and implemented by the company $40,000
AMP-001-2020   2020-06-25 Trans-Northern Pipelines Inc. Oakville, Ontario s. 29 of the Onshore Pipeline Regulations – Failure to contract for services as prescribed $40,000
AMP-001-2019 2019-06-14 Plains Midstream Canada Regina, Saskatchewan Failure to locate a pipeline as prescribed by para. 6(1)(b) of the Damage Prevention Regulations – Obligations $76,000
AMP-002-2018   2018-07-10 Trans-Northern Pipelines Inc. Montreal Feeder System Contravention of a Board Order $28,000
AMP-001-2018   2018-06-25 Canadian Natural Resources Ltd. Ojay Pipeline Failure to comply with condition of a Board Order re: PCEMR submission $40,000
AMP-001-2017 2017-12-07 Landstar Projects Surrey (BC) 6(b) of the PCR, Part I for an unauthorized activity without written permission from the pipeline company prior to excavation $28,000
AMP-012-2015 2015-12-02 Conoco Phillips Canada Operations Ltd. Elmworth Station U to B Pipeline Integrity Project, Beavertail Creek (AB) 30(1) of the Act – Operation of a pipeline without a certificate and leave to open (Type B) $28,000
AMP-011-2015 2015-07-29 Melcor Developments Ltd. Rosenthal Blvd and 224 Street, Edmonton (AB) 112(1) of the Act – Construction of a facility or excavation without leave (Type B) $28,000
AMP-010-2015 2016-03-02 Enbridge Pipelines Inc. Line 4, Strome (AB) 4 of the OPR – Failure to ensure that a pipeline is designed, constructed, operated or abandoned as prescribed (Type B) $28,000
AMP-009-2015 2016-03-02 Westcoast Energy Inc. (Spectra Energy Transmission) Transmission North Expansion Project (BC) 2(3) of the AMP – Failure to comply with Condition 7 of Order XG-W102-005-2011 $4,000
AMP-008-2015 2015-04-17 Westcoast Energy Inc. (Spectra Energy Transmission) Pine River Gas Plant (BC) 49(1.1) of the PPR – Failure to notify as Prescribed (Type A) $6,300
AMP-007-2015 2016-02-12 Enbridge Pipelines Inc. Edmonton to Hardisty Pipeline Project (AB) Failure to comply with Condition 2 of Order XO-E101-006-2014 Rescinded
AMP-006-2015 2016-02-12 Enbridge Pipelines Inc. Plains Wascana Tank 80 (SK) Failure to comply with Condition 2 of Order XO-E101-021-2013 Rescinded
AMP-005-2015 2016-03-10 Enbridge Pipelines Inc. Line 3 replacement project construction site, Cromer (MB) 2(3) of the AMP – Failure to comply with Condition 3 of Order XO-E101-016-2013 $76,000
AMP-004-2015 2016-02-05 Enbridge Pipelines Inc. Replacement pipeline between the Cromer Terminal and the tie-in point within NW-9-926 WPM Failure to comply with Condition 2 of Order XO-E101-016-2013 Rescinded
AMP-003-2015 2015-02-12 Plains Midstream Canada ULC (Plains) Canada 53(1) and 55 of the OPR – Failure to conduct inspections and audits as prescribed (Type B) and Failure to document the audit as prescribed (Type B) $76,000
AMP-002-2015 2015-02-06 Enbridge Pipelines Inc. Edmonton to Hardisty Pipeline Project (AB) 2(3) of the AMP – Failure to comply with Condition 2 of Order XO-E101-006-2014 $16,000
AMP-001-2015 2015-01-22 Westcoast Energy Inc. (Spectra Energy Transmission) Dawson Creek Gas Plant (BC) 4(1) of the PPR – Failure to ensure that the company’s processing plant is designed, constructed, operated or abandoned as prescribed (Type B) $88,000
AMP-006-2014 [PDF] 2014-12-15 Lone Pine Resources Canada Ltd. Ojay Pipeline 2(3) of the AMP – Non-compliance with Condition 15 of Order XG-C357-09-2010 $28,000
AMP-005-2014 [PDF] 2014-09-08 Steve Minotakis (Dr Four Beat Energy Corporation) Meter station and piping between NW5-1-11W4 and SW-1-11WA near Aden (AB) 2(2) of the AMP – Non-compliance with Conditions 3 and 4 of Order SG-D081-01-2013 $25,000
AMP-004-2014 [PDF] 2014-12-11 Dr Four Beat Energy Corporation Meter station and piping between NW5-1-11W4 and SW-1-11WA near Aden (AB) 2(2) of the AMP – Non-compliance with Conditions 3 and 4 of Order SG-D081-01-2013 $100,000
AMP-003-2014 [PDF] 2014-07-02 Trans Mountain Pipeline ULC Nipisi Facility Piping at the Trans Mountain Edmonton Terminal (AB) 2(3) of the AMP – Non-compliance with Condition 2 of Order XO-T260-009-2013 $16,000
AMP-002-2014 2014-11-20 Canadian Natural Resources Ltd. Ladyfern Pipeline 25 of the OPR – Failure to perform pressure testing as prescribed (Type B) $28,000
AMP-001-2014 [PDF] 2014-05-23 Nova Gas Transmission Ltd. Musreau Lake West Receipt Meter Station (AB) 31(a) of the Act – Construction of a pipeline without a certificate (Type B) $16,000
Inspection officer orders

An order issued by an inspection officer is a tool we may use to ensure company takes prompt action. A breach of an inspection officer order is a punishable offence and could mean fines, imprisonment, or both.

We may require a company to:

  • immediately suspend work
  • stop (cease) the operation or activity
  • complete special measures or terms

Search the table

Inspection Officer Orders
Number Related
Documents
Last Updated
(yyyy-mm-dd)
Recipient Region/
Facility
Description
JJD-1-2012 2012-07-11 Montreal Pipe Line Ltd. Pumping Station, St. Césaire (QC) Release of hydrovac slurry
JJD-2-2012 2012-10-05 Vantage Pipeline Vantage Pipeline Project Unauthorized construction activities
JJD-3-2012 2013-01-11 Vantage Pipeline Vantage Pipeline Kangaroo Rat areas 1 & 5 Work taking place in contradiction of conditions of original Certificate
MJS-003-2012 2013-04-15 City of Boucherville Montreal PipeLines Limited (MPLL) pipeline, Boucherville (QC) Improper contractor oversight
MJS-004-2012 2013-01-15 Les Entreprises Nord-Construction Montreal PipeLines Limited (MPLL) pipeline, Boucherville (QC) Unauthorized activities on pipeline right-of-way 
TS-01-2012 2013-02-19 Westcoast Energy Ltd (Spectra Energy Transmission Ltd) Pine River Gas Plant, Hasler Flats (BC) Uncontained disposal of hydrovac waste
KAR-001-2013 2013-05-30 BC Hydro Trans Mountain ULC and Westcoast Energy Inc. / Spectra Energy Transmission pipelines (BC) Unauthorized activities
KAR-002-2013 2013-05-06 Rokstad Power Corp. Trans Mountain pipeline (BC) Unauthorized activities
KF-001-2013 2013-11-19 NOVA Gas Transmission North Central Corridor (AB) Pipeline rupture / restriction on Return to Service
KF-002-2013 2013-12-10 NOVA Gas Transmission Flat Lake Lateral Loop (AB) Pipeline rupture / restriction on Return to Service
LMR-001-2013 2013-01-22 Vantage Pipeline Spread B (SK) Inadequate buffers/ vehicle crossings for watercourse
NNM-001-2013 2013-10-18 Vantage Pipeline Spread D (SK) Inadequate implementation of the construction inspection program
SR-001-2013 2013-04-18 Canadian Natural Resources The Knappen Border Pipeline and Associated Facilities owned by DR Four Beat Energy Corp. Does not meet pipeline regulations
DWL-001-2014 2014-08-28 Enbridge Pipelines Inc. Line 3 Replacement Project, Cromer (MB) Failure to comply with a term or condition of any certificate, license, permit, leave or exemption granted under the NEB Act
KAR-001-2014 2015-05-20 Landowner Canada Unauthorized excavation activity
KAR-002-2014 2014-11-26 Landowner Canada Unauthorized excavation activity
KF-001-2014 2014-10-03 NOVA Gas Transmission Limited Buffalo Creek West Resricted pressure increase
DRA-1-2015 2015-11-25 NOVA Gas Transmission Ltd. 460118.18E, 6355403.14N Non-compliance with Project Environmental Protection Plan
RCT-1-2015 2015-11-30 Westcoast Energy Inc. (Spectra Energy Transmission) British Columbia INC2015-138 – Release of a toxic substance (amine) at the Pine River Gas Plant
RRW-001-2015 2015-12-09 Westcoast Energy Inc. (Spectra Energy Transmission) Kobes Creek Booster Station (BC) Inability to demonstrate that the overhead cranes are safe to operate.
SCB-001-2015 2015-05-21 Westcoast Energy Inc. (Spectra Energy Transmission) Fort Nelson Gas Plant (BC) Inability to demonstrate that there are a sufficient number of qualified workers to safely conduct operations
GC-001-2016 2016-11-23 TransCanada PipeLines Limited Kingston Meter Station (ON) Wall thickness value for blasting the pipe
SLM-001-2017   2017-08-24 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Access bridges, Riparian Management Areas, sediment and erosion control
SLM-002-2017 2017-08-27 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Bridges, watercourses
RRW-001-2017 2017-09-13 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Pipe handling, hauling and stringing
RRW-002-2017 2017-09-29 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Pipe handling, hauling and stringing
TC-001-2018 2018-07-13 Centra Transmission Holdings Tribes Rock Replacement Project, Ontario Project design and construction not following OPR and CSA
JFB-001-2018 2018-08-22 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Sediment and erosion control issues at watercourses
AML-001-2018 2018-08-26 Enbridge Pipelines Inc. Line 3 Replacement Program Inability to demonstrate appropriate buffers are in place for wetlands
NB-001-2018
(Amendment No. 1)

 

 

2018-10-23 Westcoast Energy Inc. Prince George (BC) Amendment No. 1 issued to extend Restricted Operating Pressure (ROP) to entire Line 2 (previously specific to Segment 4A on Line 2), and to modify timeline for implementation of overpressure protection
NB-001-2018
(Amendment No. 2)
2018-12-10 Westcoast Energy Inc. Prince George (BC) Overpressure protection system of the NPS 36” Line 2 set as required

Pressure reduction of the NPS 30” Mainline and NPS 36” loop

Amendment No. 2 issued to modify Restricted Operating Pressure and timeline for implementation of overpressure protection
AML-002-2018 2018-12-02 NOVA Gas Transmission Limited North Montney Project, Chetwynd, BC Environmental activities
MMO-001-2018 2018-12-02 NOVA Gas Transmission Limited North Montney Project, Chetwynd, BC Wetlands mitigation activities
NB-001-2018 (Amendment No. 3) 2019-11-28 Westcoast Energy Inc. Prince George, BC Amendment No.3 issued to temporarily increase Restricted Operating Pressure from Station 2 to Station 9 from 85% to 88% of respective segment’s 60 day high pressure prior to the incident until February 28, 2019.
LJP-001-2019 2019-03-22 Trans Northern Pipelines Inc. Long Sault, ON Remediation activities
MP-001-2019 2019-11-06 Trans Northern Pipelines Inc. Ontario Deficiencies in the Environmental Remediation & Contaminated Sites Management Program
JJD-001-2019 2019-08-28 Trans Northern Pipelines Inc. Belleville pump station, Ontario Repairs required to the swale system for water surface management
MP-002-2019 2019-11-12 Trans-Northern Pipelines Inc. Richmond Hill, Ontario Insufficient information provided in an Information Request on contaminated sites
TH-001-2019
  • Notice of Measures to be Taken
2019-12-18 TC Energy Calgary (AB) Lock-out-tag-out (LOTO) naming and tagging inconsistencies
HCA-001-2020 2020-02-06 NOVA Gas Transmission Ltd. North Montney Mainline Project, Spread 1, Chetwynd, BC Multiple non-compliances and/or hazards to the environment, including observations within the Peace Moberly Tract (PMT), a unique, environmentally sensitive area of great significance to local indigenous communities
BL-001-2020 2020-07-27 Landowner Ontario Report of unauthorized activity on Line 10
Commission orders and directions

If we’re having trouble bringing a company into compliance with other tools or we need to address a specific safety or environmental concern, we may issue an order or letter of direction from the Commission. They can be issued at any time and may contain measures a company must take to address issues or non-compliances. A breach of a commission order or direction is a punishable offence and could mean fines, imprisonment, or both.

Search the table

CER Letter and Order
Order
Number
Related
Documents
Last Updated
(yyyy-mm-dd)
Recipient Region/
Facility
Description

SG-C293-01-2011

2012-09-18

Centra Transmission Holdings Ltd. Birmingham (MI), USA Non-compliance with Board Order

SG-T201-002-2011

2011-10-28

TransCanada PipeLines Limited, on behalf of Trans Québec & Maritimes Pipeline Line 2000 Pipeline anomalies

SO-E102-002-2011

2013-13-22

Enbridge Pipeline (NW) Inc. Norman Wells to Zama Pipeline (Line 21), at Willow Lake River (NT) Release of crude oil

SO-P384-004-2011

2011-12-01

Plains Midstream Canada Milk River (AB) and the Wascana (SK) crude oil mainlines Issues from 2009 audit

OF-Surv-Gen 01

2012-08-24

Enbridge Pipeline Inc. Edmonton (AB) NEB to inspect Control Centre

SG-C293-002-2012

2014-06-11

Centra Transmission Holdings Ltd. Birmingham (MI), USA Non-compliance with Board Order

SG-W102-001-2012

2012-09-18

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Pipeline rupture

SO-K077-005-2012

2012-12-21

Kinder Morgan Cochin Pipeline System Stress Corrosion Cracking failure on US system

SO-T241-002-2012

2014-06-04

TransCanada PipeLines Limited (TransCanada) on behalf of TransCanada Keystone Pipeline GP Limited (Keystone) Portage La Prairie, Rapid City, Moosomin and Richardson (MB, SK) Lack of alternate power source for pump stations

CO-001-2013

2013-10-18

Imperial Oil Resources Ltd. Norman Wells Production Facility (NT) Flowline Leaks

SG-D081-01-2013

2014-04-15

DR Four Beat Energy Corp. Knappen Border Pipeline and associated facilities (AB) Failure to file an Emergency Procedures Manual; inadequate emergency signage and contact information

SG-N081-001-2013

2014-12-18

TransCanada PipeLines Limited NOVA Gas Transmission Ltd. Grande Prairie Mainline Loop (Elmworth Section) (AB) Pipeline anomaly

SG-N081-004-2013 & SG-N081-005-2013

2013-12-20

NOVA Gas Transmission NPS 8 Mitsue Lateral and NPS 6 Ukaltal Lateral (AB) Gas Leaks

SG-N081-006-2013

2013-12-20

NOVA Gas Transmission NPS 24 North Lateral Extension Loop (AB) Gas Leak

SG-T211-003-2013

2013-08-30

TransCanada PipeLines Limited Compressor stations (ON, SK, AB) Incidents involving a fire or an explosion in compressor/meter stations in 2009, 2011 and 2012

OA-1204-003-2013

2013-02-15

Husky Oil Operations Ltd. Husky Little Bear wells and facilities (NT) Health and safety issues at work camp

SO-E101-001-2013

2013-05-02

Enbridge Pipeline Inc. System wide Emergency back-up power and push button shut down keypads at pump stations

SO-E101-002-2013

2013-05-23

Enbridge Pipeline Inc. System wide Cracking incidents

SO-E101-003-2013

2013-06-17

Enbridge Pipeline Inc. Edmonton Control Room Regulatory requirements

SO-E101-004-2013

2013-06-03

Enbridge Pipeline Inc. Edmonton Terminal (AB) Overpressure incidents

SO-T217-003-2013

2013-08-29

Trans-Northern Pipelines Return to Full Pressure from Montreal to Farran’s Point Integrity Management Program - Application to Increase Pressure Pursuant to Safety Order SO-T217-03-2010

SO-T260-005-2013

2014-10-24

Kinder Morgan Canada Inc. Trans Mountain Pipeline NPS 24 Mainline - Liquids Leak

GPLO-C298-003-2014

2014-04-21

Canadian Natural Resources Limited (CNRL) Ladyfern Pipeline (AB) Unsupervised hydrostatic test

OC-062-2015

2015-01-23

Enbridge Pipelines Inc. Edmonton to Hardisty Pipeline Project (AB) Application for a Variance of the Certificate to Allow for Modifications to the Project Specifications

OPLO-K077-004-2014

2014-07-16

Kinder Morgan Elmore, Saskatchewan, Fort Saskatchewan, Alberta Portion Cochin Pipeline System Reversal Project

SG-N081-001-2014

2016-01-25

NOVA Gas Transmission Canada Restriction on return to service

SG-T211-002-2014

2014-04-17

TransCanada Pipelines Limited Canadian Mainline Line 100-4 at MLV 2 + 3.3 km near Burstall (SK) Engineering Evaluation for Temporary Pressure Reduction Relaxation

SG-W102-003-2014

2014-05-28

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Gas release

SO-P384-001-2014

2014-03-17

Plains Midstream Canada Milk River (AB) and the Wascana (SK) crude oil mainlines Pressure restriction on oil mainline

M0-066-2015

2015-11-12

Enbridge Pipelines (NW) Inc. British Columbia Requesting Approval to Modify Two Requirements Of Safety Order SO-E102-002-2011, as Amended Revision to NEB Letter Dated 16 November 2015 and Order Approved 12 November 2015

SG-N081-001-2015

2015-05-21

NOVA Gas Transmission Western AB System Mainline, Airdrie (AB) Change of Class Location

SG-W102-002-2015

2016-07-15

Westcoast Energy Inc. (Spectra Energy Transmission) Canada Address a number of concerns with respect to the operations at Westcoast’s processing plants and facilities

SO-P384-001-2015

2015-01-15

Plains Midstream Canada ULC Canada 2010 Operational Audit - Implementation of Safety Management and Environmental Protection Program Corrective Actions

Letter

2015-03-04

Enbridge Pipelines Inc. Line 9B Reversal and Line 9 Capacity Expansion Project, Westover to Montreal Terminal Request for information on use of Non-Disclosure Agreements regarding Emergency Information
Letter [PDF]
  • Canadian Energy Pipeline Association Letter
2015-05-02   Non-Disclosure Agreements for Emergency Procedures Manuals  

MO-020-2016

2016-05-24

TransCanada Keystone Pipeline GP Ltd. (AB) Field Inspection, Environmental Protection CVA 1516-431

SO-P384-001-2016

2016-02-11

Plains Midstream Canada ULC Ontario Windsor Sarnia Pipeline Reactivation
Order MO-011-2012 (Order)
Plains’ Final Reports pursuant to Conditions 4, 5 and 6 of the Order

AO-001-SO-T217-03-2010

2020-07-17

Trans-Northern Pipelines Inc Canada Overpressure and Pipeline Exposure Incidents

XG-C357-09-2010

2014-08-07

Lone Pine Resources Canada Ltd. Ojay Pipeline Variance to Order XG-C357-009-2010. Failure to comply with Condition 15 of Order XG-C357-09-2010

XO-T260-009-2013

2014-05-08

Trans Mountain Pipeline ULC (Kinder Morgan Canada) Edmonton (AB) Order XO-T260-009-2013 - Leave to Open Application

XG-N081-021-2013

2014-04-28

NOVA Gas Transmission Musreau Lake West Receipt Meter Station Order XG-N081-021-2013 - NGTL Application for Leave to Open

OF-Surv-Inc-2012 81

2012-09-07

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Pipeline rupture / restriction on Return to Service

OF-Surv-Inc-2013 110

2012-09-07

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Pipeline rupture / restriction on Return to Service

Letter Decision

2020-07-22

Trans-Northern Pipelines Inc. Canada Commission’s decision to deny TNPI’s request for confidential treatment of Historical Spills, Leaks and Damage Incident Inventory Information
Audit reports

Once we finish an audit of a company we regulate, we publish a report and a letter closing the audit. We expect all companies to consider and review the findings in these reports and use them to improve their management systems.

Search the table

Audit Reports
Audit
Number
Themes Related
Documents
Last Updated
(yyyy-mm-dd)
Recipient Region/
Facility
OF-Surv-OpAud-W102-2019-2020 01 [PDF] Audit Report – Contractor Oversight   2020-07-31 Westcoast Energy Inc., carrying on business as Spectra Energy Transmission Canada
OF-Surv-OpAud-P384-2019-2020-01 [PDF] Audit of Control Room Management   2020-05-28 Plains Midstream Canada ULC Canada
OF-Surv-OpAud-T260-2019-2020-01 [PDF] Final Audit Report – Contractor Oversight   2020-06-30 Trans Mountain Pipeline Canada ULC Canada
OF-Surv-OpAud-T217-2019-2020 01 [PDF] Audit of Control Room Management   2020-03-25 Trans-Northern Pipelines Inc. Canada
OF-Surv-OpAud-T241-2018-2019 01 [PDF] Pre-Construction Compliance Audit 2020-03-12 TransCanada Keystone Pipeline GP Ltd. Alberta, Saskatchewan, Manitoba
OF-Surv-OpAud-E101-2019-2020-01 [PDF] Audit of Control Room Management   2020-03-11 Enbridge Pipelines Inc. Alberta
OF-Surv-OpAud-V044-2018-2019-01 [PDF] Quality Assurance Program Audit

 

2019-05-15 Veresen Energy Pipeline Incorporated Alberta / British Columbia
OF-Surv-OpAud-M253-2018-2019-01 [PDF] Integrity Management Program 2019-04-09 Montreal Pipe Line Limited Quebec
OF-Surv-OpAud-A174-2018-2019-01 [PDF] Quality Assurance Program 2019-04-03 AltaGas Holdings Inc. Alberta
OF-Surv-OpAud-C298-2018-2019 01 [PDF] Integrity Management Program 2020-07-07 Canadian Natural Resources Limited Canada
OF-Surv-OpAud-E236-2018-2019-01 [PDF] Quality Assurance Program   2018-12-18 Emera Brunswick Pipeline Company Ltd. New Brunswick
OF-Surv-OpAud-A159-2018-2019-01 [PDF] Integrity Management Program   2019-06-26 Alliance Pipeline Ltd. Alberta / Saskatchewan
OF-Surv-OpAud-T309-2017-2018 01 [PDF] Hazard and Risk Assessment as related to Emergency Management 2018-06-26 Tundra Energy Marketing Limited – Westspur Pipelines Limited Canada
OF-Surv-OpAud-Ml82-2017-2018 01 Hazard and Risk Assessment as related to Emergency Management 2018-05-24 Many Islands Pipe Lines (Canada) Limited Saskatchewan and Alberta
OF-Surv-OpAud-Z034-2017-2018 01 Hazard and Risk Assessment as related to Emergency Management 2018-12-18 Enbridge Gas Distribution Inc. (2193914 Canada Limited) and Niagara Gas Transmission Limited (Enbridge Gas Distribution Inc.) Ontario
OF-Surv-OpAud-T241-2017- 01 Hazard and Risk Assessment as related to Emergency Management 2018-03-07 TransCanada Keystone Pipeline GP Ltd. Alberta, Saskatchewan, Manitoba
OF-Surv-OpAud-T260-2015-2016 01 [PDF] Final Audit Report of the Emergency Management Program 2019-06-24 Trans Mountain Pipeline ULC Canada
OF-Fac-Oil-E101-2014-11 04 [PDF] Pre-Construction Compliance Audit Report – Line 3 Replacement Project 2017-10-19 Enbridge Pipeline Inc. Alberta, Saskatchewan and Manitoba
OF-Surv-OpAud-T260-2016-2017 0101 Pre-Construction Compliance Audit Report 2017-08-03 Trans Mountain Pipelines ULC. Canada
OF-Surv-OpAud-K077-2016-2017 01 4.1 Inspection, Measurement and Monitoring 2017-06-19 Kinder Morgan Cochin ULC Canada
OF-Surv-OpAud-P384-2016-2017 01 [PDF] 4.2 Investigation and Reporting Incidents and Near Misses 2017-05-10 Plains Midstream Canada ULC.
Aurora Pipeline Company Ltd.
Canada
OF-Surv-OpAud-P384-2016-2017 02 [PDF] 4.1 Inspection, Measurement and Monitoring 2017-04-18 Plains Midstream Canada ULC.
Aurora Pipeline Company Ltd.
Canada
OF-Surv-OpAud-T260-2016-2017 01 4.1 Inspection, Measurement and Monitoring 2017-03-27 Trans Mountain Pipelines ULC. Canada
OF-Surv-OpAud-P749-2016-2017 01 4.2 Investigation and Reporting Incidents and Near Misses 2017-03-14 Pembina Energy Services Inc. Canada
OF-Surv-OpAud-M124-2016-2017 01 4.2 Investigation and Reporting Incidents and Near Misses 2017-03-06 Maritimes & Northeast Pipeline Management Ltd Canada
OF-Surv-OpAud-W102-2016-2017 01 4.1 Inspection, Measurement and Monitoring 2019-02-12 Westcoast Energy Inc., Carrying on Business as Spectra Energy Transmission Canada
OF-Surv-OpAud-T217-2016-2017 01 4.1 Inspection, Measurement and Monitoring 2017-01-18 Trans-Northern Pipelines Inc. Canada
OF-Surv-OpAud-E092-2016-2017 01 4.2 Investigation and Reporting Incidents and Near Misses 2016-12-09 Express Pipeline Ltd. Alberta
OF-Surv-OpAud-A159-2014-2015 02 2016-03-31 Alliance Pipeline Ltd. Canada
OF-Surv-OpAud-E101-2014-2015 03 2015-03-31 Enbridge Pipelines Inc. Canada
OF-Surv-OpAud-P102-2009-2010 01
  • Safety Management
  • Environmental Protection
2014-08-14 Plains Midstream Canada ULC Canada
OF-Surv-OpAud-T211-2013-2014 01 2014-03-31 TransCanada Pipelines Limited Canada
OF-Surv-OpAud-W102-2010-2011 01 [PDF]
  • Integrity Management
  • Safety Management
  • Environmental Protection
  • Emergency Management
2013-03-23 Westcoast Energy Inc., carrying on business as Spectra Energy Transmission (Westcoast) Canada
OF-Surv-OpAud-S380-2012-13 01
  • Integrity Management
  • Safety Management
  • Environmental Protection
  • Emergency Management
  • Third Party Crossing
  • Public Awareness
2013-03-22 Spectra Energy Empress Management Inc. (Spectra Energy Empress L.P. (SET-PTC)) All SET-PTC
OF-Surv-OpAud-W102-2011-2012 01
  • Integrity Management
  • Safety Management
  • Environmental Protection
  • Emergency Management
  • Crossings
  • Public Awareness
2013-03-22 Westcoast Energy Inc., carrying on business as Spectra Energy Transmission (Westcoast) Canada
OF-Surv-OpAud-T211-2012-2013 01 2012-10-30 TransCanada Pipelines Limited Canada
OF-Surv-OpAud-M124 01
  • Integrity Management
  • Safety Management
  • Environmental Protection
  • Emergency Management
  • Third Party Crossing
  • Public Awareness
  2012-05-25 Maritimes and Northeast Pipeline Ltd Halifax (NS)
OF-Surv-OpAud-E236 01
  • Integrity Management
  • Safety Management
  • Environmental Protection
  • Emergency Management
  • Third Party Crossing
  • Public Awareness
  2012-04-27 Emera Brunswick Pipeline Company Ltd. Halifax (NS)