ARCHIVED - National Energy Board Onshore Pipeline Regulations, 1999 (OPR-99) Final Audit Report for Integrity Management, Safety, Environmental Protection, Emergency Management, Crossings and Public Awareness Programs - Appendix VIII - Documents Reviewed

This page has been archived on the Web

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

Appendix VIII
Westcoast OPR-99 Audit
Documents Reviewed

  • Set-West Audit Review Meeting Agenda
  • Spectra Energy Process Safety Management – How we categorize PSM incidents
  • Email – General Listing of items which are indicative for observation and possible reporting from aerial pipeline patrols.
  • Spectra Energy Pre-Task Analysis Card
  • Pre – Operations Safety Checklist
  • Set West operations, Programs Organized by Focus Areas
  • Set West Operations, OSC Safety Tour Expectations to Area Management
  • OMS leadership roles, responsibilities, processes
  • (OSE offsite meetings - seven per year; every six -- eight weeks)
  • weekly OSC meetings(every Friday)
  • incident review meetings (every Friday)
  • Joint OSC/OMT incident review meetings (monthly)
  • Analyze Audit Data – Tool
  • Manage Audit Preparation and Response –Tool
  • Track Findings to Completion – Tool
  • Set – West Audit Review Meeting
  • Set West Environmental Health and Safety – Prolonged Work Policy Audit #920STW012, June 22,2012
  • Risk Assessment Guide, January 2012
  • Critical task Analysis
  • Train A Still, Mobilization & Prep Work (Completed Critical Task Analysis)
  • SET – West OSC STIP Scorecard – October 2012, Operations Scorecard & Team Objectives
  • 2013 Set -West Operations Purpose & Set – West Operations 2013 Our Purpose Explained
  • OSC Safety Tour Expectations to Area Management
  • OMS Leadership Roles, Responsibilities, Processes
  • Figure 4: Business Planning – Management review
  • Spectra Energy – First Responder Handbook
  • Spectra Energy – Emergency Preparedness management System (Draft 2013 Proposal)
  • Spectra Energy – Exercise Evaluation Form
  • Spectra Energy – Spectra Energy Transmission – Integrated Preparedness Planning “Program Manual”
  • 2012 Emergency Exercise Status
  • Emergency Preparedness Scorecard
  • Spectra Energy – Regulatory Incident Reporting Guidelines For On-Call Incident Reporting Supervisor
  • 26 November 2012 - Auditor received documents as per document review list; however, no documents were reviewed for this summary period.
  • Spectra Energy – Custom Report (IIR – Incident Report)
  • SET – Incident Investigation System
  • Spectra Energy – Incident/Emergency Reporting Procedure
  • Spectra Energy – Environment, Health & Safety (EHS) Checklist
  • N4 – 2012 – ERP, ICS, Incident Commander Notes, Action Checklist, Incident Ranking Matrix, Notification Matrix, Scribe Resource, Timeline, Primary Assignments, Documentation, Notification Report
  • Spectra Energy West Division Emergency Exercise and Training (N3 N4)
  • Spectra Energy PTC Emergency Preparedness Training (June 6, 2012 Tabletop Exercise - Richardson)
  • Spectra Energy PTC Emergency Preparedness Training (June 7, 2012 Table Top - Dewdney)
  • Spectra Energy PTC Emergency Preparedness Training (September 4, 2012 Table Top - Fort Whyte)
  • Spectra Energy PTC Emergency Preparedness Training (September 5, 2012 Field Exercise - Richardson)
  • Chilliwack Chaser - Spectra Energy – SET West Full Scale Exercise (Exercise Chilliwack February 1, 2011 participant Instructions)
  • Chilliwack Chaser - 2011 Exercise Chilliwack Chaser After Exercise Action List ( Facilities, Resources, Procedures)
  • Chilliwack Chaser - incident follow-up email with observations and lessons learned
  • Chilliwack Chaser - Spectra Energy Operations and Crisis Management Emergency Communications Plan
  • Chilliwack Chaser - Preliminary report for Exercise “Chilliwack Chaser” – February 1, 2011
  • Chilliwack Chaser - Hotwash notes
  • Chilliwack Chaser - Parking Lot Issues for RRC
  • Chilliwack Chaser - Narrative from simulated ICP
  • 27 November 2012 – Auditors received and reviewed all documents and records requested as per document review list. No outstanding requests are outstanding.
  • SET-West OSC Monthly Scorecard – October 2012
  • Ground Stain Inspection IPDM (14 November 2012)
  • Pipeline Right-of-Way Inspection Report - 10” Sikanni (19 October 2011)
  • Pipeline Right-of-Way Inspection Report - 8” Adsett (6 July 2011)
  • Email (hard copy) regarding Pipeline patrol/IRR (27 November 2012)
  • Process Safety Management – How we categorize PSM Incidents (26 July 2011)
  • Process Safety Management – A Guide for SET West Operations Leaders (pamphlet)
  • SET West Operations – Programs organized by focus areas (14 October 2012)
  • Job Ticket and Annual Pigging Facility Safety Inspection Form – 10” Fireweed O/L Rec Bbl Job Ticket (18 May 2012 and 22 June 2012)
  • Job Ticket – 10” Fireweed O-L Rec Blacken Flare (28 November 2012)
  • Annual Pigging Facility Safety Inspection Form – Revision 3.0 (30 May 2012)
  • Draft SET West Benzene Management Standard (15 February 2008)
  • SET-West Audit Review Meeting – Standing Agenda for 4 Dec 2012 (28 November 2012)
  • Analyze Audit Data – Tool (last updated 6 January 2010)
  • Track Audit Findings to Completion Tool (last updated 4 July 2012)
  • Manage Audit Preparation and Response – Tool (last updated 4 July 2012)
  • Our Environment: Our Responsibility – Module 4 Presentation (Updated July 2012)
  • Our Environment: Our Responsibility – Module 4 Quiz (Revised 24 November 2008)
  • Our Environment: Our Responsibility – Prelude to Modules 5,6,7 (Updated 1 October 2010)
  • FSJ Gathering OGWR Registration – Overview (27 November 2000)
  • FSJ Gathering Air Permits – Overview (27 November 2000)
  • FSJ Gathering Effluent Permits – Overview (27 November 2000)
  • Pipeline Environmental Regulatory Guide (December 2004)
  • Our Environment: Our Responsibility – Module 5 Presentation (February 2009)
  • Our Environment: Our Responsibility – Module 5,6,7 Quiz (February 2009)
  • Our Environment: Our Responsibility – Module 6 Presentation (February 2009)
  • Our Environment: Our Responsibility – Module 7 Presentation (February 2009)
  • 2010-2011 Public Awareness and Emergency Preparedness Survey Report
  • Org Chart – Lands and Public Safety (the source 01/02/2012)
  • Spectra Energy Annual Report – 2011 (excerpts)
  • Spectra Energy Sustainability Report- 2011 (excerpts)
  • Weekly Regulatory Update November 16-23 (sample)
  • Spatial Data Management Scope Document (June 2007)
  • Crossing Inspector Resources page from the Source (26/11/2012)
  • Lands and Pipeline Safety Awareness, Spectra Energy Transmission
    Crossing Application and Damage Prevention – Roles and Responsibilities (to be approved and posted by December 31, 2012)
  • Landowner information package Includes:
  • Map
  • Resident Information Card (to be completed and returned to Spectra Energy with envelope
  • Pipeline Safety and Emergency Preparedness (along the gathering system and along pipeline system
  • Spectra sticker with contact information
  • Call before you dig – BC One Call pamphlet
  • Land Agent business card
  • Contractor Breakfast feedback form (sample)
  • Excavation and Construction near Spectra Transmission’s Pipeline System
  • Management of Change Descriptions of Affected Applications, Systems, Documentation and Processes (2012-06-08)
    Spectra Energy Transmission: Crossing Administration Procedures and Reference Manual (Updated July 2011)
  • Damage Prevention Program – Third Party activities with potential to damage a Spectra Energy Pipeline
  • Assessment / practice for third party activities requiring written permission (December 12, 2011)
  • Damage Prevention Program – Third Party activities with potential to damage a Spectra Energy Pipeline
  • Assessment / practice for agricultural activities on private land (October 31, 2011)
  • Damage Prevention Program – Third party excavations within the 30 metre zone (November 14, 2012)
  • Damage Prevention Program – On-site permit approval procedure (July 16, 2012)
  • Guidelines – For applications to cross facilities of WEI doing business as Spectra Energy Transmission- BC Pipeline & field services
  • Spectra Energy – BC Pipeline & BC Field Services Third Party activity permitting process summary table (December 2011)
  • Damage Prevention Program – Application form for ground disturbance/facility construction within and/or in proximity to a Spectra Energy Transmission’s pipeline right of way (November 15, 2011)
  • BC Pipeline and Field Services – Standard Operating Practice- Third Party Vehicle Crossing Application Process (2012-07-18)
  • Vehicle Crossing Information Form (Schedule D) (Nov 2, 2012)
  • Spatial Data Management Third Party Permitted Line Crossing As-Building (Feb 17, 2011)
  • GIS permit samples for
  • Pipeline Under Crossing
  • Permanent Road Crossing
  • Temporary Vehicle Access Crossing
  • Buried Cable Crossing
  • Power Line (aerial crossing)
  • Excavation within safety zone
  • Excavation within the right of way
  • Excavation abutting the right of way
  • Pipeline parallel (abutting) the right of way
  • Logging Cutblock within the safety zone
  • Seismic Program within the safety zone
  • Ditching within the right of way
  • Fence Crossing
  • Contract Approval Policy (Last revised 10/03/2012)
  • Continuing Education and Public Awareness Program (2012-2014)
  • 2012 STIP goals – Public Awareness (March 1, 2012)
  • Damage Prevention Group-2012 STIP Goals
  • Public Awareness/ Damage Prevention Activity Plan 2012 (March 22, 2012)
  • SET –West Operations Standard – Incident Reporting and Investigation (March 23, 2012)
  • Damage Prevention Program – How to report unauthorized activity in proximity to Spectra Energy Pipelines (March 1, 2012)
  • Reporting form for unauthorized activity within and / or in proximity to Spectra Energy Transmission’s Pipeline right of way (September 4, 2012)
  • Sample presentations
  • Third Party Activity in proximity to Spectra Energy’s Pipeline – BC Hydro (October 11, 2012)
  • Third Party Activity in proximity to Spectra Energy’s Pipeline – DGS Astro Safety Meeting (May 14) Fort St John
  • Contractor breakfast (November 6, 2012)
  • Working Safely near NEB regulated Pipelines
  • EHS Management System Performance Standards – Contractor H&S Management Performance Standard 5.0 (November 1, 2011)
  • Career Zone Performance Management Employee Year End Self-Assessment Quick Reference (September 10, 2011)
  • OPA Standard – Management of Change (undated)
  • MOC Process Standard (June 2000)
  • SET West Lands Department – Field Responsibilities and third party crossing activity
  • How to complete a field inspector’s Crossing Report Form
  • Damage Prevention Program – How to complete a Spectra Energy Pipeline locate report form
  • PLFS Field Operations Technical Training Requirements (July 26, 2010)
  • BC Pipeline and Field Services – Standard Operating Practice – Line Locating (2012-03-05)
  • SET West Ground Disturbance Standard (December 6, 2011)
  • Records Management Policy
  • Detailed Exception Report by User (sample training records from Learning Management System)
  • BC Pipeline and Field Services – Standard Operating Practice – Right of Way Maintenance (2011-10-27)
  • BC Pipeline and Field Services – Standard Operating Practice – Right of way Pipeline Signage (2012-03-16)
  • BC Pipeline and Field Services – Standard Operating Practice - Right of Way Acquisitions and Settlement of Damage Claims (2012-03-01)
  • BC Pipeline and Field Services – Standard Operating Practice – Use Existing Right of Way (2012-02-22)
  • Email announcement for contractor mail out announcement (April 18-12
  • Spectra Energy – Landowner Information and Public Safety
  • Agricultural Ground Disturbance on-site approval permit/ inspection report form(05/12)
  • Spectra Energy Transmission – Encroachment Resolution Guidelines (updated May 2005)
  • Encroachment Removal form
  • BC One Call Ticket Procedures (06/15/2010)
  • BC One Call Emergency Ticket Procedures and contact numbers (06/18/2010)
  • One Call Ticket Processing Procedures (undated)
  • BC One Call – Daily Check sheet (January 2011)
  • One Call Stats Form
  • Spectra Energy – BC Pipeline & BC Field Services – Backfilling Practices (2011-12-05)
  • Spectra Energy – BC Pipeline & BC Field Services – Line Locating ( 2012-03-05)
  • Spectra Energy – BC Pipeline & BC Field Services – Pipeline Right of Way Patrol (2011-12-01)
  • Spectra Energy – Pipeline Right of Way Inspection Report
  • If a One Call location has the potential to affect the facilities of Spectra Energy Transmission and Spectra Midstream Corporation
  • Emergency One Call Process Map (April 2012)
  • One Call Process Map (April 2012)
  • Spectra Energy Transmission- West One Call Summary Report (26/11/2012)
  • Spectra Energy Operations: Unauthorized Third-Party Activity Quick Reference Guide
  • Spatial Data Management Third Party Permitted Line Crossing As-Building (February 17, 2011)
  • Spectra Energy- Damage Prevention Program – How to Report Unauthorized activity in proximity to Spectra Energy Pipelines
  • Discovery of Unauthorized activity on, or within 30 metres of, a Spectra Energy Pipeline Right of Way – Reporting guide internal (March 1, 2012)
  • Records Management Policy (06/24/11)
  • SDM – GIS Data Standard and Metadata GIS>Lands System> Third Party Permit (June 25, 2012)
  • SDM – GIS Data Standard and Metadata GIS> Gas Facilities> Line Crossing (November 8, 2010)
  • Third Party Permit Manager (GIS) Updated May 15, 2010
  • Introduction to the Major Incidents Corrective Actions Project (MICA)
  • Spectra Energy Transmission West Empress PTC Pipeline Audit, Audit # 211004, November 8, 2011 ( Audit scope includes the examination of the maintenance and integrity programs in place at PTC pipeline during June 1, 2002 - August 31, 2011)
  • Set West -- EHS & Ops Services, Organizational Review Feedback Presentation for the OSC meeting April 4, 2012
  • Core International Inc. – a consulting firm proposal for organizational design support at set West ( EHS & Operations Services Group)
  • Completed Records pertaining to an unstable slope monitoring location ( 3.1 right-of-way maintenance) location 12 “Milligan Peejay P/L, South approach slope to the Betton River.
  • 12-051N Permit – 3rd Party Pipeline Crossing – Inspection Report – Probe Corrosion Services Ltd.
  • 12-063(30m) – Permit Excavation w/in 30m of ROW
  • Proximity agreement request (Spectra Damage Prevention 2012 Form
  • Correspondence – Proximity Agreement Request – LC1
  • Correspondence – Proximity Agreement Request – JD2
  • Correspondence – Proximity Agreement Request – JD3
  • Correspondence – Proximity Agreement Request – LC2
  • Pembina’s Borehole Drilling for Groundwater Monitoring Wells Near: 16” Boundary Lake
  • 12-063(30m) Permit
  • 3 Working Days Notice: 12-063(30M) Pembina’s Borehole Drilling within 30M
  • Spectra Energy Transmission Pipeline Locate Report – 12-063(30M)
  • Probe Corrosion Services Ltd – Pembina Pipeline Corporation’s – Request to Evacuate (for Borehole Drilling) in the area of the Right-of Way containing the following Westcoast Energy Inc., doing business as Spectra Energy Transmission pipeline(s): Inspection Report
  • Investigative Dig Process for Landowners
  • Spectra Energy Flaring Notice w/maps
  • Annual Cathodic Protection Survey
  • Letter to Landowner RE: Pipeline Corrosion Digs 2012-12’ Milligan PeeJay
  • Spectra Energy BC Pipeline and Field Services Standard Operating Practice – Third Party Vehicle Crossing Application Process
  • Spectra Energy Schedule “C” Vehicle Crossing Information Form
  • Spectra Energy Vehicle Crossing Engineering Assessment Request Form
  • Request for a Pipeline Crossing and Proximity Agreement for Block 24014 – 12-223N Application
  • 12-223N – Correspondence - Request for a Pipeline Crossing and Proximity Agreement for Block 24014 – 12-223N Application
  • 12-223N – Correspondence – XLA-2012-073
  • 12-223N – Correspondence – Canfor Road Use
  • 12-223N – Correspondence – Canfor Permanent Vehicle Crossing Request – XLA-2012-073
  • 12-223N – Correspondence – Third Party Permits (12-223N & 12-098(30M) – Canfor’s permanent access road over and cut block within 30M of 20” Jedney
  • 12-223N – Correspondence – Spectra Energy Transmission Permits: 12-223N & 12-098(30M)
  • 12-223N – Correspondence – Executed Crossing No. 12-223N
  • 12-223N – Correspondance – 16” Lapp
  • 12-223N – Correspondance – 16” Lapp Images
  • Spectra Energy Transmission – Vehicle Crossing Engineering Assessment Request Form – XLA-2012-073
  • 12-223N Permit – Canadian Forest Products ltd.’s (the “Crosser”) Proposed Permanent Access Crossing over the following Westcoast Energy Inc., doing business as Spectra Energy Transmission, (the “Company”) pipeline(s):
  • 12-223N Permit – Canadian Forest Products ltd.’s (the “Crosser”) Proposed Permanent Access Crossing over the following Westcoast Energy Inc., doing business as Spectra Energy Transmission, (the “Company”) pipeline(s): (Executed copy)
  • 3 Working Days Notice: 12-223N Canfor
  • 12-223N Probe Corrosion Services Ltd Inspection Report
  • 12-223 Spectra Energy Transmission Pipeline Locate Report
  • 12-051N Permit – Spectra Energy RE: Canadian Natural Resources Limited’s (the “Crosser”) Proposed 3.5: OD Sour Natural Gas Pipeline Crossing the following Westcoast Energy Inc., doing business as Spectra Energy Transmission, (the “Company”) pipeline(s):
  • 12-051N Permit – Canadian Natural Resources Limited Pipeline from d-52-H, 94-A-13 to b-51-H, 94-A-13 CNRL File No. 1133391 Pioneer File No. 0142-12
  • 12-051N 3 Working Days Notice – BC One Call Request 2012342444 – Notice of intent to evacuate – Short Notice Locate
  • 12-051N- Pipeline Locate Report
  • Request on behalf of CNRL: Pipeline from d-52-H, 94-A-13 to Wellsite b-51-H, 94-A-13 – CNRL File No. 1133391
  • 12-051N Correspondence - Request on behalf of CNRL: Pipeline from d-52-H, 94-A-13 to Wellsite b-51-H, 94-A-13 – CNRL File No. 1133391
  • 12-051N Correspondence – 12-051N for review
  • 12-051N Correspondence – Third Party Permit – CNRL’s pipeline crossing
  • 12-051N Correspondence - Third Party Permit – CNRL’s pipeline crossing –KG1
  • 12-051N Correspondence - Third Party Permit – CNRL’s pipeline crossing – LC1
  • 12-051N Correspondence – Spectra Energy Permit 12-051N
  • 12-051N Correspondence – Pipeline Crossing # 12-051N
  • 12-051N Correspondence – 107C-1/12-051N/FSJ
  • 12-051N Correspondence - 107C-1/12-051N/FSJ/DW
  • 12-051N Correspondence – Report 12-051N
  • MTS_Org.pdf
  • Current RP List and Maps
  • RPList_20120312.pdf
  • GatheringandMainline.pdf
  • GatheringandMainline.pdf
  • GatheringMapOverview.pdf
  • GTandC_Article11_PCOPP.pdf
  • GTandC_Article12_GasQuality.pdf
  • RGT_MeasurementPolicy.pdf
  • RES_MeasurementPolicy.pdf
  • PCOPP_CalibrationForm.pdf
  • RGT_PCOPPSpecification.pdf
  • BeaverRiverEngAssessment.pdf
  • SampleOPPPC_ComplianceReport.pdf
  • FTN_RP10126_PCOPP_Drawing.pdf
  • FSJ_RP10346_PCOPP_Drawing.pdf
  • GV_RP8566_PCOPP_Drawing.PDF
  • Residue_MS184_PCOPP_Drawing.pdf
  • PCOPP_SiteNonComplianceReport.pdf
  • Inspection Results.pdf
  • HighRiskLines_OnlineMonitors.pdf
  • RTU Control.pdf
  • FSJ_AOCMeeting.pdf
  • EmailRegardingPiggingReport.pdf
  • PiggingReport.pdf
  • ResidueGasMeasurementReport.pdf
  • FW Pipeline Integrity Plan.msg
  • Pipeline Integrity Management.doc
  • FW SOP Update Meetings.msg
  • 2009 OM Manual Update - Document Tracking.xls
  • 2009 OM Manual Update Meeting.docx
  • 2011 SOP Update - Document Tracking_RL.xlsx
  • 2011 SOP Review Agenda.docx
  • 2010 SOP Update - Document Tracking_RL.xlsx
  • 2010 SOP Update Meeting.docx
  • FW SOP Update Meetings.msg
  • 2009 OM Manual Update Meeting.docx
  • RE Performance Indicators.msg
  • SET-West - Performance Indicators - Annual NEB.XLSX
  • FW Audit - Compressor Station Recoat Program.msg
  • SET-West Audit Review Meeting (3 pages)
  • SET-West SCADA field device and network equipment security (BC Pipeline Division) Audit #410005 October 5 2011 (6 pages)
  • SET-West Leak Detection Systems Audit #411007 – 13 December 2011 (9 pages)
  • SET-West SCADA Audit #407007 – 20 November 2008 (15 pages)
  • SET-West Risk Assessment Pipeline Integrity Program SET Board of Directors Meeting December 2009 (2 pages)
  • FW Pipeline Integrity Plan.msg
  • Pipeline Integrity Management.doc
  • FW SOP Update Meetings.msg
  • SET-West OSC Monthly Scorecard - 2011 and 2012.pdf
  • SET-West OSC STIP Scorecard - December 2011.pdf
  • FW Documents for NEB.msg
  • 2011 CP (Pipe-to-Soil) Survey's Grizzly Gathering.msg
  • BRAZION 20 INCH (PL-17000).xlsx
  • BULLMOOSE 8 inch LATERAL (12000LT1).xlsx
  • CHAMBERLAIN 12 INCH (PL-16400).xlsx
  • EXTENSION 16 INCH (PL-19100).xlsx
  • GOODRICH RE-INJECTION 6 INCH (PL-19400).xlsx
  • GOODRICH RE-INJECTION EXTENSION 6 INCH (19400EX1).xlsx
  • GRIZZLY 10 INCH (PL3-12000).xlsx
  • GRIZZLY 20 INCH (PL2-12000).xlsx
  • GRIZZLY 24 INCH (PL1-12000).xlsx
  • GRIZZLY 24 INCH LOOP (LP-12000).xlsx
  • KWOEN ACID GAS REINJ. PPL 6 INCH (PL-19300).xlsx
  • MURRAY RIVER 12 INCH (PL-16500).xlsx
  • MURRAY RIVER 12 INCH (PL-16500DE01).xlsx
  • RED WILLOW 6 INCH (PL-13500).xlsx
  • SOUTH SUKUNKA 16 INCH (PL-14900DE1).xlsx
  • SOUTH SUKUNKA 24 INCH LOOP (PL-14900L).xlsx
  • SUKUNKA 8 INCH LATERAL (PL-12000DE02).xlsx
  • WAPITI 10 INCH (PL-16700).xlsx
  • WEEJAY LATERAL PIPELINE 10 INCH (PL-19200).xlsx
  • CouponSummary Oct 2009 Chet.xlsx
  • CouponSummaryChet april 2010.xlsx
  • Corrosion Coupon Summary Oct 2009 - Chetwynd Gathering.msg
  • CouponSummary Oct 2009 Chet.xls
  • Pine River Gathering Coupon Exposure Summary - April 2010.msg
  • CouponSummaryChet april 2010.xls
  • Fort St John Gathering Pipeline & Barrel Coupon Summary Oct 2010.msg
  • CouponSummarybyRegionFSJ Oct 2010.xls
  • Fort St John Gathering Pig Barrel Coupon Summary July 2011msg
  • CouponSummary FSJ Barrel Coupons July 2011.xls
  • April 2010 Pipeline Corrosion Coupon Summary.msg
  • CouponSummaryFN april 2010.xls
  • FW: Emailing: 2011 Fort Nelson Gathering.msg
  • Adsett 8 inch(14600PL1)
  • Beaver River 24 inch(09600PL1)
  • Cabin 16 inch(10000PL1)
  • Clarke Lake 16 inch Loop(08500LP1)
  • Clarke Lake 16 inch(08500PL1)
  • East Kotcho 10 inch(10300DE01)
  • Ekwan 16 inch(12800PL1)
  • Gote Pipeline System 12 inch(10100PL1)
  • Helmet 16 inch(10400PL1)
  • Hossitl 8 inch(15300PL1)
  • Klua 16 inch(15600PL1)
  • Louise 20 inch(09900PL1)
  • North Helmet 16 inch Loop(10400LP2)
  • North Shekilie 10 inch(12900PL1)
  • Northwest Helmet 8 inch Extension(10400EX1)
  • Pesh 8 inch(13900DE01)
  • Pesh 16 inch Loop(13900LP1)
  • Petitot 10 inch(10200PL1)
  • Pointed Mountain 20 inch(09700PL1)
  • Sahtaneh (Junior) 24 inch(12800PL4)
  • Sierra 12 inch(09200PL1)
  • Sierra 16 inch Loop(09200LP1)
  • Sierra-Sahtaneh 16 inch(12800PL3)
  • South Clarke Lake 8 inch(12500PL1)
  • South Shekilie 10 inch(17800PL1)
  • Southeast Helmet 10 inch Extension(10400DE02)
  • Southeast Helmet 16 inch Loop(10400LP1)
  • West Clarke Lake 6 inch(15900DE01)
  • Yoyo 24 inch(09000PL1)
  • FW: Grizzly Gathering Area Coupon Summary Spring of 2011.msg
  • Coupon Summary by Region 2011 Spring PRRG.xls
  • April 2010 Pipeline Corrosion Coupon Summary.msg
  • Coupon Summary FN April 2010.xls
  • Spring 2011 Coupon Summary.msg
  • Coupon Summary by Region1 FSJ Spring 2011.xls
  • Fort Nelson Gathering Coupon Summary - Spring 2009.msg
  • FtNELSONspr09.xls
  • Fort Nelson Gathering Pipeline & Barrel Coupons - Oct 2010.msg
  • Coupon Summary by Region FN Oct 2010.xls
  • Example 1 - 8 East Osborne
    • 8 East Osborn 2010 Dig Report Summary.doc
    • 8_ East Osborn ILI Results.pdf
    • Annotated 2010 BJ Pipeline Tally - 8 Osborn.xls
  • Example 2 - 10 North Shekilie
    • 10 North Shekilie Dig#1 - 1.013KM Report.pdf
    • 10 North Shekilie Dig#2 - 3.566KM Report.pdf
    • 10 North Shekilie Dig#3 - 4.769KM Report.pdf
    • 10 North Shekilie Dig#4 - 9.740KM Report.pdf
    • 10 North Shekilie Dig#5 - 10.353KM Report.pdf
    • 2009 Dig Report Summary 10 North Shekilie.pdf
    • Annotated 10 North Shekilie 2009 Pipe Tally.xls
    • CHAINAGE 10 North Shekilie.xls
  • Example 3 - MML2
    • 36 MML2 Dig #5 - 24.02KM 2011 Log Report.pdf
    • 36 MML2 Dig #6 - 26.54KM 2011 Log Report.pdf
    • 36 MML2 Dig #11 - 47.74KM 2011 Log Report.pdf
    • 36 MML2 Dig #12 - 49.51KM 2011 Log Report.pdf
    • 36 MML2 Dig #13 - 51.15KM 2011 Log Report.pdf
    • Analysis email.pdf
    • Annotated 2011 BJ Pipeline Tally 36 MML2.xls
    • CHAINAGE 36 MML2.xls
  • 2BL1 2008 pipeline Corrosion Growth (RPR) - Metric_Rev2.xlsx
  • CLOCKSPRING_UTM_COORDINATES.xls
  • 15YRPLn2.xls
  • Multiyear ILI Plan 2000-2019
  • ILI History – all pipelines T-North
  • Fort Nelson Gathering Pipeline & Barrel Coupons - Oct 2010.msg
  • CouponSummarybyRegionFN Oct 2010.xls
  • 6BL1 HiHum Geotechnical Update Oct 2007.pdf
  • 8AL1 km 5.3 Coldwater 2007 Work Summary V2.pdf
  • 8AL1 km 5.3 Spectra Energy Coldwater plan.pdf
  • 8BL1 km 18.7 rockfall memo.pdf
  • 6bl1 HiHium Geotechnical Update Final March 2006.pdf
  • 6BL1 HiHum Geotechnical Update Dec 2008.pdf
  • 4AL1 km 34.5 Shelley Hill Report Version 2 for bid package.pdf
  • 6BL1 2010 HiHium Recommendations Email.pdf
  • 4al1 km 34.5 Shelley as built without figures.pdf
  • 2L1 km 31.8 West Pine -As-constructed Letter Report - 25 June 2010.pdf
  • 2L1 km 31.8 West Pine - Erosion Protection Plan - 29 Jan 2010.pdf
  • SET-West Asset Management Definitions - Critical Systems.pdf
  • Percent Critical PM Work Completed 2011.pdf
  • Accountabilty Management.pdf
  • Accountabilty Management.pdf
  • CP Test Point Surveys - 2007 to 2011.pdf
  • SET-West - Rectifier Site Summary.pdf
  • SET-West - Rectifier Site Summary.pdf
  • Compressor Station CP Surveys.pdf
  • Test Lead Post Repair Data.pdf
  • PEIMP - Revision 1.pdf
  • Postponement of 4BL2 Weld 12610 and 13390.docx
  • Dent Review.pdf
  • Dent Review.xlsx
  • SET West Training DeterminationTool_Final_March 28, 2012.xlsx
  • 100% EHS Training Compliance Process.pdf
  • IMRegulatoryReportingGuidelines.docx
  • OneWindowIncidentReportingProcedure.docx
  • Acuren Report CS8B 2006
  • A06619-00300_01-02R0 60DUK001001 Station 8B Recoat - Site Map-Visits.doc
  • A06619-00300_01-03R0 60DUK001001 Station 8B Recoat – Procedure.doc
  • A06619-00300_01-04R0 60DUK001001 Station 8B Recoat - Visit 1.doc
  • A06619-00300_01-05R0 60DUK001001 Station 8B Recoat - Visit 2.doc
  • A06619-00300_01-06R0 60DUK001001 Station 8B Recoat - Visit 3.doc
  • A06619-00300_01-07R0 60DUK001001 Station 8B Recoat - Visit 4.doc
  • A06619-00300_01-08R0 60DUK001001 Station 8B Recoat - Visit 5.doc
  • A06619-00300_01-09R0 60DUK001001 Station 8B Recoat - Visit 6.doc
  • A06619-00300_01-10R0 60DUK001001 Station 8B Recoat - Visit 7.doc
  • A06619-00300_01-11R0 60DUK001001 Station 8B Recoat - Visit 8.doc
  • A06619-00300_01-12R0 60DUK001001 Station 8B Recoat - Visit 9.doc
  • A06619-00300_01-13R0 60DUK001001 Station 8B Recoat - Visit 10.doc
  • A06619-00300_01-14R0 60DUK001001 Station 8B Recoat - Visit 11.doc
  • A06619-00300_01-15R0 60DUK001001 Station 8B Recoat - Visit 12.doc
  • A06619-00300_01-16R0 60DUK001001 Station 8B Recoat - Visit 13.doc
  • A06619-00300_01-17R0 60DUK001001 Station 8B Recoat - Visit 14.doc
  • Compressor Station 8B Schematics
    • 8201-21.pdf
    • 9001-02.pdf
    • 9001-03.pdf
    • 9001-04.pdf
    • 9001-05.pdf
    • 9001-08.pdf
    • VaultServlet.pdf
  • Compressor Station 8B Photos
    • CS 8B 30in bypass.jpg
    • DSCN0507.jpg
    • DSCN0508.jpg
    • P5190088.jpg
    • P5190089.jpg
    • P6020029.jpg
    • P6020030.jpg
    • P6190001.jpg
    • P6230042.jpg
    • P8010068.jpg
  • Compressor Station 8B Miscellaneous
    • Acuren risk identificaiton and communication form.xls
    • EHS Risk Documentation_Ogilvie Mountain Holding Ltd.xls
    • hydrovac eveready risk identificaiton form (3).xls
    • RStreng LOF-A-01 30 Bypass.xls
    • Authority for Expenditure.doc
    • Delivery Truck Procedure for CS8B Recoat Job 2006.doc
    • Integrity U0858 CS8B Recoat.doc
    • RE Cs8B Discharge.txt
    • H&S-42%20Personal%20Protective%20Equipment.pdf
    • RE spill Pile on Telus RW.htm
  • Information not available.DOC
  • Information not available CERTIFICATES.PDF
  • Information not available.DOC
  • Information not available.PDF
Top of Page
Date modified: