Notice to Resume Work or of Measures Satisfied – Neels Nurseries – Order MJS–001–2026

Notice to Resume Work or of Measures Satisfied – Neels Nurseries – Order MJS–001–2026 [PDF 88 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:

Neels Nurseries that the hazardous or detrimental situation described in Order No. MJS–001–2026 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •     suspended work may resume, and/or

  •  X  the measures specified in the Order have been satisfied.
Inspection Officer

Inspection Officer

9 July, 2026

Date

 
 
 
 

IO Designation Number

Signature

210-517 10 Ave SW, Calgary AB  T2R 0A8

Date modified: