Notice to Resume Work or of Measures Satisfied – Westcoast LP – Order DRP-002-2025
Notice to Resume Work or of Measures Satisfied – Westcoast LP – Order DRP-002-2025 [PDF 320 KB]
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED,
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
Westcoast LPFootnote i that the hazardous or detrimental situation described in Order No. DRP-002-2025 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- suspended work may resume, and/or
- X Specified measures 1 and 2 of the Order have been satisfied. Specified measure 3 of Order DRP-002-2025 remains in place until the corrective and preventive actions identified in measure 2 have been fully implemented, unless otherwise directed by the undersigned Inspection Officer.
Inspection Officer |
12 December 2025 |
|
|---|---|---|
Date |
||
| REDACTED |
REDACTED |
|
IO Designation Number |
Signature |
|
210-517 10 Ave SW, Calgary AB T2R 0A8 |
||
CVA or incident #: DTP2025-258 and CV2526-323
- Date modified: