Notice to Resume Work or of Measures Satisfied – NGTL GP Ltd. – Order DRP-001-2025
Notice to Resume Work or of Measures Satisfied – NGTL GP Ltd. – Order DRP-001-2025 [PDF 213 KB]
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED,
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
NGTL GP Ltd. that the hazardous or detrimental situation described in Order No. DRP-001-2025 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X suspended work may resume, and/or
- X the measures specified in the Order have been satisfied.
Inspection Officer |
24 July 2025 |
|
|---|---|---|
Date |
||
|
|
|
IO Designation Number |
||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
||
CVA number: CV2526-306