Notice to Resume Work or of Measures Satisfied – Twin Rivers Paper Company – Order AK-001-2021
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED,
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
Twin Rivers Paper Company, that the hazardous or detrimental situation described in Order No. AK-001-2021 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- suspended work may resume, and/or
- X the measures specified in the Order have been satisfied.
Inspection Officer |
2025-11-03 |
|
|---|---|---|
Date |
||
IO Designation Number 2279 |
Signature |
|
210-517 10 Ave SW, Calgary AB T2R 0A8 |
||
CVA or incident #:
- Date modified: